ANALISIS PERBANDINGAN PERHITUNGAN VOLUME METODE BIM DAN METODE KONVENSIONAL (STUDI KASUS: GEDUNG BANK MANDIRI PALEMBANG)
Sari
The advancement of digital technology has encouraged the construction industry to improve efficiency, accuracy, and cost control through the implementation of Building Information Modeling (BIM). This study compares concrete volume calculations using the conventional two-dimensional method and the BIM-based approach with Autodesk Revit. The case study focuses on the construction of the Bank Mandiri Building in Palembang, a 12-storey reinforced concrete structure consisting of bored piles, pilecaps, columns, beams, and slabs. The conventional method involved identifying structural dimensions from AutoCAD drawings and calculating volumes using Microsoft Excel based on geometric formulas, while the BIM method was conducted by developing a three-dimensional structural model in Revit and extracting quantities through the schedule/quantities feature. The comparison was analysed by calculating the percentage difference between both methods. The results show that the overall difference in concrete volume is 0.1599%, indicating a relatively small deviation. The average differences for bored piles and pilecaps are minimal, while columns, beams, and slabs show slightly higher variations, with beams and slabs presenting the largest discrepancies. These differences are mainly influenced by modelling details, drawing interpretation, rounding processes, and potential human error in both approaches. Overall, the findings demonstrate that BIM provides accurate and efficient quantity estimation; however, its reliability depends on the modeller’s precision. Therefore, both conventional and BIM methods remain complementary and can be used together to enhance accuracy and minimise errors in concrete volume estimation.
Keywords: Quantity-Takeoff, BIM, Concrete
Teks Lengkap:
PDFReferensi
Berlian P., C. A., Adhi, R. P., Hidayat, A., & Nugroho, H. (2016). Perbandingan Efisiensi Waktu, Biaya, dan Sumber Daya Manusia Antara Metode Building Information Modeling (BIM) dan Konvensional. Jurnal Karya Teknik Sipil, 5(2), 220–229. http://ejournal-s1.undip.ac.id/index.php/jkts
Dwi Novita, R., & Pangestuti, E. K. (21 C.E.). Analisa Quantity Take Off dan Rencana Aanggaran Biaya dengan Metode Building Information Modeling (BIM) Menggunakan Software Autodeks Revit 2019 (Studi Kasus: Gedung LP3 Universitas Negeri Semarang). Dinamika TEKNIK SIPIL, 14(1)(1), 27–31.
Dwianto, R., Mahya, H. Z., Taurano, G. A., & Wijaya, H. A. (2023). Perbandingan Perhitungan MC-0 Metode Konvensional & Building Information Modelling (BIM) Terhadap Realisasi Pekerjaan. Konstruksia, 14(2), 109. https://doi.org/10.24853/jk.14.2.109-118
Jatmiko, A. D., Poerwanto, L., Tedja, B. G., Louis, L. E., Alexander, D., & Surya, A. (2023). Pemodelan Building Information Modeling Bangunan Rumah Sakit Untuk Pengecekan Volume dan Bentrokan. Arsitekta : Jurnal Arsitektur Dan Kota Berkelanjutan, 5(01), 1–7. https://doi.org/10.47970/arsitekta.v5i01.369
Jonathan, R., & Anondho, B. (2021). Perbandingan Perhitungan Volume Pekerjaan Dak Beton Bertulang Antara Metode Bim Dengan Konvensional. JMTS: Jurnal Mitra Teknik Sipil, 4(1), 271. https://doi.org/10.24912/jmts.v0i0.10473
Pantiga, J., & Soekiman, A. (2021). Kajian Implementasi Building Information Modeling (BIM) di Dunia Konstruksi Indonesia. Rekayasa Sipil, 15(2), 104–110. https://doi.org/10.21776/ub.rekayasasipil.2021.015.02.4
Pratama, Y. N., Lusiana, & Nuh, S. M. (2023). Analisis Selisih Volume Pekerjaan Struktur antara Model BIM Autodesk Revit, Perhitungan Konvensional, dan BOQ. 1–9.
Ramandhani, A. E., Saefudin, A., & Agustina, S. (2024). PENERAPAN BUIDING INFORMATION MODELING ( BIM ) DALAM PERBANDINGAN QUANTITY TAKE OFF MATERIAL PADA PROYEK PEMBANGUNAN BSI TOWER JAKARTA Modeling ( BIM ). Building Information Modelling ( BIM ) adalah teknologi dalam bidang yang diperlukan untuk pelaksanaan. 9, 98–106.
Reista, I. A., Annisa, A., & Ilham, I. (2022). Implementasi Building Information Modelling (BIM) dalam Estimasi Volume Pekerjaan Struktural dan Arsitektural. Journal of Sustainable Construction, 2(1), 13–22. https://doi.org/10.26593/josc.v2i1.6135
Sadad, I., Jaya, F. H., & Januar, I. W. (2022). Implementasi BIM Take Off Quantity Material Struktur Abutment Jembatan Terhadap Volume Rencana. Teknika Sains: Jurnal Ilmu Teknik, 7(2), 91–97. https://doi.org/10.24967/teksis.v7i2.1960
Suwarni, A., & Anondho, B. (2021). Perbandingan Perhitungan Volume Kolom Beton Antara Building Information Modeling (Bim) Dengan Metode Konvensional. JUTEKS : Jurnal Teknik Sipil, 6(2), 75. https://doi.org/10.32511/juteks.v6i2.743
Wayan suasira, I Made Tapayasa, I made Anom Santiana, & I Gede Satra Wibawa. (2021). Analisis Komparasi Metode Building InformationModeling (Bim) Dan Metode Konvensional PadaPerhitungan Rab Struktur Proyek(Studi Kasus Pembangunan Pasar Desa Adat Pecatu). Jurnal Teknik Gradien, 13(01), 12–19. http://www.ojs.unr.ac.id/index.php/teknikgradien
DOI: https://doi.org/10.31869/rtj.v9i2.7824
Article Metrics
Sari view : 0 timesPDF - 0 times
Refbacks
- Saat ini tidak ada refbacks.
##submission.copyrightStatement##
Kunjungan Dari Negara

Rang Teknik Journal is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.










