ANALISIS KETERLAMBATAN PROYEK PENINGKATAN JALAN KREMBUNG-MOJORUNTUT KABUPATEN SIDOARJO

Masliyah Masliyah, Nina Saraswati, Mohammad Afif Ardian Firmansyah

Sari


Delays are a frequent challenge in construction projects, often arising from a combination of internal and external factors. This study focuses on analyzing delays in the Krembung–Mojoruntut Road Improvement Project in Sidoarjo Regency. A quantitative approach was adopted, utilizing the Earned Value Management (EVM) method to assess both cost and time performance. Data were collected from contract documents, S-curves, daily reports, and weekly progress updates spanning 27 weeks of project implementation. The analysis centered on three key indicators: Budgeted Cost of Work Scheduled (BCWS), Budgeted Cost of Work Performed (BCWP), and Actual Cost of Work Performed (ACWP). The findings reveal that the project experienced delays almost every week, with varying degrees of deviation, necessitating two schedule addendums. In the 26th week, the Schedule Performance Index (SPI) was 0.96, indicating a slight lag behind schedule, while the Cost Performance Index (CPI) was 1.05, showing that the project remained cost-efficient. The estimated total cost at completion (Estimate at Completion/EAC) was Rp10,067,384,650.67, slightly below the original contract value, while the estimated completion time (Estimate at Schedule/EAS) aligned with the revised target, thanks to the additional time granted through the addendums. Key factors contributing to the delays included late material procurement, adverse weather conditions, and less-than-optimal workforce management (Kharina & Sambowo; Mahapatni & Putra, 2022).

Keywords: Project Delay, Estimate At Completion, Estimate At Schedule


Teks Lengkap:

PDF

Referensi


Bela, K,R., Sarya, G., & Triana, M.I.(2023. Analisis Pengendalian Waktu Dan Biaya Pada Proyek. 1153-1164.

Hajek, G. (1994). Manajemen Proyek. In Journal of the Korean Physical Society (Vol.60,Issue5).http://kin.perpusnas.go.id/DisplayData.aspx?pId=41722&pRegionCode=TR UNOJOYO&pClientId=639

Handayani, I., & Nugraheni, F. (2022). Evaluasi Pelaksanaan Proyek Menggunakan Metode Earned Value Analysis (Studi Kasus Proyek Pembangunan Jalan Tapin Banjarmasin).

Lamato, F., Utiarahman, A., & Tuloli, Mohammad Yusuf, 2018. (2018). Analisis Earned Value Terhadap Proyek Pembangunan Renovasi. 1(2), 46–53.

Mahapatni, I. A. P. S. (2019). Metode Perencanaaan dan Pengendalian Proyek Konstruksi. In UNHI Press.

Rani,H.A.(2016). Manajemen Proyek Konstruksi. 99.

https://www.researchgate.net/publication/316081639_Manajemen_Proyek_Konstruksi

Sesmiwati, S., Hatta, U. B., Ariani, V., Hatta, U. B., Roza, F., & Hatta, U. B. (2017). Review Penyebab Keterlambatan Pada Proyek Konstruksi. June 2021, 14–22. https://doi.org/10.21063/SPI3.1017.15-22

Shaputra, M. R. E., Nisumanti, S., & Puspita, N. (2022). Analisis Penyebab Keterlambatan Masa Pelaksanaan Pada Proyek Jalan Ruas Betung – Mangunjaya. TEKNIKA: Jurnal Teknik, 9(1), 65. https://doi.org/10.35449/teknika.v9i1.222

Sri Mahapatni, I. A. P., Putra, C., & Murwanta, K. E. (2022). Analisis Kinerja Waktu dan Biaya Pelaksanaan Proyek dengan Metode Earned Value Pada Proyek Pembangunan Jembatan Pangkung Dalem Ruas Jalan Gitgit-Wanagiri Jurnal Ilmiah Kurva Teknik 11(2),17–25.




DOI: https://doi.org/10.31869/rtj.v9i2.7574

Article Metrics

Sari view : 0 times
PDF - 0 times

Refbacks

  • Saat ini tidak ada refbacks.


##submission.copyrightStatement##

"Web Kunjungan Saat ini

Kunjungan Dari Negara

 Flag Counter

 

 

Creative Commons License
Rang Teknik Journal is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.