ANALISIS PERBANDINGAN PENGGUNAAN BEKISTING PADA PEKERJAAN MUT PROYEK RUSUN PASPAMPRES IKN

Nina Saraswati, Masliyah Masliyah, Sandi Dwi Riyanto

Sari


The use of conventional formwork and formwork systems in Multi Utility Tunnel (MUT) construction projects has focused on cost efficiency, quality of work results, and implementation time. A case study was conducted on the Paspampres Flats construction project in the Indonesian Capital City (IKN)Abdullah (2024). The analysis involved identifying material, labor, and equipment costs, evaluating the quality of concrete casting, and measuring the duration of installation, casting, and dismantling. The findings indicate that system formwork outperforms conventional formwork across all three aspects. In terms of cost, system formwork is more efficient for large and repetitive projects as it can be reused multiple times and reduces material waste. Rossaty and Safitri (2022)Regarding quality, system formwork produces smoother, more precise concrete surfaces with minimal leakage. From the perspective of time, the modular characteristics of system formwork accelerate installation and dismantling processes. Therefore, the application of system formwork in MUT projects proves to be more optimal and aligns with modern construction efficiency principles, emphasizing faster execution and enhanced structural quality.

Keywords: Conventional formwork, system formwork, cost efficiency, concrete quality, project duration, Multi Utility Tunnel (MUT)


Teks Lengkap:

PDF

Referensi


Abdullah. 2024. Strategi Kelancaran Pembangunan Multi Utility Tunnel Di Ibu Kota Negara Nusantara : Perencanaan, Jadual, Dan Pencegahan Konflik Dalam Pembangunan Kota Modern.

Bambang Siswanto, Agus, dan Mukhamad Afif Salim. 2019. Manajement Proyek Pengadaan Jasa Konstruksi Dengan E-Procurement View Project International Journal of Civil Engineering and Tecgnology View Project.

https://www.researchgate.net/publication/339787455.

Firda, A., and A.I Putra. 2019. “ANALISA PERBANDINGAN BIAYA DAN WAKTU BEKISTING KONVENSIONAL DAN BEKISTING SISTEM LICO PEMBANGUNAN VENUE DAYUNG JSC.” Jurnal Desiminasi Teknologi 7 Nomor 2.

Glory, Esther, Philomena Clarita Welan, Yongki Alexander, Tanne / Crane, Esther Glory Sirait, and Yongki Alaxander Tanne. 2023. “PERBANDINGAN PENGGUNAAN SISTEM BEKISTING KONVENSIONAL DAN ALUMUNIUM PADA PROYEK PEMBANGUNAN MALL X.” CRANE : Civil Engineering Research Journal 4. https://ojs.unikom.ac.id/index.php/crane.

Hidayat, A., and C. Ramadhany. 2021. 07 ANALISA PENERAPAN MANAJEMEN WAKTU PADA PROYEK PEMBANGUNAN JEMBATAN GANTUNG LUBUK ULAK DENGAN METODE CPM.

Khairunnisa, N., and R. Widayati. 2020. JURNAL TEKNOLOGI SIPIL ANALISIS PENGENDALIAN BIAYA DAN WAKTU TERHADAP PROYEK KONSTRUKSI DENGAN METODE EARNED VALUE (STUDI KASUS: PROYEK PERUMAHAN PENAJAM PASER UTARA).

Lagonda, A.T., and P.A.K Pratasis. 2021. “Analisis Penerapan Manajemen Waktu Pada Proyek Konstruksi (Studi Kasus: Office and Distribution Center, Airmadidi, Minahasa Utara).” TEKNO 19 No. 78.

Manabung, N., A.K.T Dundu, and D.R.O Walangitan. 2018. “SISTEM PENGAWASAN MANAJEMEN MUTU DALAM PELAKSANAAN PROYEK KONSTRUKSI (Studi Kasus: Pembangunan Gedung Laboratorium Fakultas Teknik Unsrat).” Jurnal Sipil Statik 6(12): 1079–84.

Rani, H.A. 2016. MANAJEMEN PROYEK KONSTRUKSI. Yogyakarta.

Maulana, B.F., and S Abadiyah. 2024. “Analisa Perbandingan Bekisting Semi Sistem (Knockdown) Dengan Bekisting Konvensional Berdasarkan RAB.” Jurnal Pendidikan Teknik Bangunan 4 Nomor 2.

Maulana, H.R., and M. Cakrawala. 2024. “ANALISIS PERBANDINGAN PENGGUNAAN BEKISTING KONVENSIONAL DAN SEMI KONVENSIONAL DARI ASPEK MUTU, WAKTU DAN BIAYA.” Jurnal Ilmiah Teknik Sipil dan Lingkungan 4(1).

Pratama, H.S, and R.K Anggraeni. 2017. 6 ANALISA PERBANDINGAN PENGGUNAAN BEKISTING KONVENSIONAL, SEMI SISTEM, DAN SISTEM (PERI) PADA KOLOM GEDUNG BERTINGKAT. http://ejournal-s1.undip.ac.id/index.php/jktsTelp.:

Rivelino, and A. Soekiman. 2016. “KAJIAN PENGENDALIAN MUTU KONSTRUKSI PADA PENGAWASAN PEMBANGUNAN JARINGAN IRIGASI KASUS: PEMBANGUNAN JARINGAN IRIGASI DI. LEUWIGOONG.” Jurnal Konstruksia 8 Nomor 1.

Rossaty, R, and R.A Safitri. 2022. “ANALISIS PERBANDINGAN PENGGUNAAN BEKISTING KONVENSIONAL DAN BEKISTING ALUMUNIUM BIAYA DAN WAKTU(Studi Kasus: Proyek Akasa Apartment Tower Kamaya, Bumi Serpong Damai, Tangerang Selatan).” Structure Teknik Sipil 4 Nomor 2.

Ulum, M.M. 2024. ANALISIS PERBANDINGAN BEKISTING KONVENSIONAL DENGAN BEKISTING SISTEM PERI PADA GEDUNG BERTINGKAT. Semarang.




DOI: https://doi.org/10.31869/rtj.v9i2.7555

Article Metrics

Sari view : 0 times
PDF - 0 times

Refbacks

  • Saat ini tidak ada refbacks.


##submission.copyrightStatement##

"Web Kunjungan Saat ini

Kunjungan Dari Negara

 Flag Counter

 

 

Creative Commons License
Rang Teknik Journal is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.