STUDY OF FACTORS CAUSING DELAYS IN BUILDING PROJECT IMPLEMENTATION IN PASAMAN DISTRICT

Akmal Jamal, Wardi Wardi, Bahrul Anif

Sari


Very important for contractor For finish work appropriate time, because matter That will profitable for owners, contractors, consultants and other parties who play a role in activities. And vice versa lateness work will very influential to reputation contractor. Objective study that is For Identify factors determine factor become dominant reason lateness implementation project buildings in the district Pasaman. Method research used that is method study in a manner quantitative that is with spread questionnaire to para respondent. Results research conducted there are 9 factors reason delay that occurred on project building in the District Passover that is that is factor Power Work, factor Managerial, Monitoring Evaluation factors, factors implementation Occupation, factor Location, factor Other, factor Characteristics Place, factor Environment, factor Constraint Implementation.

Teks Lengkap:

PDF

Referensi


A Guide to the Project Management Body of Knowledge (PMBOK@ Guide) Third Edition. Project Management Institute. 2018.

Azmeri. 2017. Analisis Penyebab Keterlambatan Pelaksanaan Proyek Ditinjau Dari Waktu Pelaksanaan Di Provinsi Aceh. ISSN 2088-9321: Universitas Syiah Kuala

Christiawan, Yulius Jogi dan Josua Tarigan. 2014. Kepemilikan Manajerial: Kebijakan Hutang, Kinerja dan Nilai Perusahaan. Vol. 9 No.1.

Civronlit. 2016. Faktor Penyebab Keterlambatan Pekerjaan Konstruksi Menurut Presepsi Kontraktor. Jurnal Civronlit Universitas Batanghari Jambi

Dipohusodo, Istimawan. 2015. Manajemen Proyek & Kontruksi. Jilid 1. Yogyakarta: Badan Penerbit Kanisius.

Dmyati, H., & Nurjaman, K. 2015. Manajemen Proyek . Bandung: CV Pustaka Setia.

Donald S. Barrie, Boyd Paulson dan Sudinarto, "Manajemen Konstruksi Profesional", Erlangga, Jakarta, 2013

Farida Sakinah, Baiq. 2015. Analisis Penyebab Keterlambatan Pada Pekerjaan Konstruksi Jalan Kabupaten Lombok Tengah Dengan Metode Analisa Faktor. Malang: Universitas Brawijaya

Idawati, I. A. A dan Sudiartha, G. M. 2014. Pengaruh Profitabilitas, Likuiditas, Ukuran Perusahaan Terhadap Kebijakan Dividen Perusahaan Manufaktur di BEI. Jurnal Ekonomi, Universitas Udayana, Bali, pp: 1604-1619.

Irfiadi. 2020. Analisis Keterlambatan Penyelesaian Pekerjaan Proyek Konstruksi Jalan Provinsi Sumatera Barat. Universitas Bung Hatta: Padang.

Kurniawan, Freddy. 2018. Jurnal Studi Kasus Keterlambatan Proyek Konstruksi Di Provinsi Jawa Timur Berdasarkan Kontrak Kerja. e-ISSN: 2460-3430 Volume 2 Nomor 2 November 2018

Margaretha Andreana Malir, Anna. 2018. Faktor - Faktor Penyebab Keterlambatan Pelaksanaan Pekerjaan Proyek Konstruksi Di Kabupaten Manokwari. Volume 1 Nomor 1 Tahun 2018

Moleong. 2012. Metodologi Kualitatif. Bandung: PT. Remaja Rosdakarya

Padma Arianie, Ganesstri. 2017. Perencanaan Manajemen Proyek Dalam Meningkatkan Efisiensi Dan Efektifitas Sumber Daya Perusahaan. Undip: Jurnal Teknik Industri, Vol. 12, No. 3, September 2017

Pastiarsa, M. 2015. Manajemen Proyek Konstruksi Bangunan Industri, perspektif. Yogyakarta: Teknisain

Pinori, Mickson. 2015. Analisis Faktor Keterlambatan Penyelesaian Proyek Konstruksi Gedung Terhadap Mutu, Biaya Dan Waktu Di Dinas Pekerjaan Umum Kota Manado. Vol.5 No.2, September 2015 (283-293) ISSN: 2087-9334

Proboyo, B. (2009). Keterlambatan waktu pelaksanaan proyek, klasifikasi dan peringkat dari penyebab-penyebabnya. Jakarta: Erlangga.

Ramang, Ruslan. 2017. Faktor-Faktor Keterlambatan Proyek Jalan Raya Di Kota Kupang Berdasarkan Persepsi Stakeholder. Jurnal Teknik Sipil, Vol. VI, No. 1, April 2017

Subagyo, A., Tri. L. Dan Arief S. 2015. Pengenalan Rumus Bangun Ruang Berbasis Augmented Reality.no. ISBN: 978-602-1180-21-1

Sugiyono. 2010. Metode Penelitian Pendidikan Pendekatan Kuantitatif, Kualitatif. Bandung: Alfabeta.

Triarman, Christopher. 2018. Analisis Faktor Penyebab Keterlambatan Waktu Pada Pekerjaan Struktur Atas Proyek Konstruksi. ISSN (p): 0853-7720, ISSN (e): 2541-4275




DOI: https://doi.org/10.31869/rtj.v7i2.5064

Article Metrics

Sari view : 17 times
PDF - 10 times

Refbacks

  • Saat ini tidak ada refbacks.


##submission.copyrightStatement##

"Web Kunjungan Saat ini

Kunjungan Dari Negara

 Flag Counter

 

 

Creative Commons License
Rang Teknik Journal is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.