MULTI-CRITERIA DECISION MODEL FOR MATERIAL SUPPLIER SELECTION FLEXIBLE PAVEMENT USING THE ANALYTICAL HIERARCHY PROCESS (AHP) METHOD

Alhanza Rizkian, Dwifitra Y Jumas, Eva Rita

Sari


This research was conducted on construction workers / contractors in the field of roads and bridges in the province of West Sumatra. This study aims to provide consideration for construction companies in choosing the right supplier by considering various criteria, determine the priority scale of supplier selection activities for construction actors/contractors, provide suggestions or solutions for selecting flexible pavement suppliers for construction actors in the province of West Sumatra by using the Analytic Hierarchy Process (AHP) method. The results showed that the criteria and sub-criteria can be used as suggestions or solutions, namely supplier profiles consisting of certificates and business licenses, not blacklisted, clear company name and address, capital, company age, performance over the last 5 years and this year, total and quality of employees, and the number of clients in a year safety records consist of taking materials with eco-friendly designations, availability of training for new employees, the importance of applying OSH in the work environment, and the number of accidents in the last 5 years and delivery consisting of timely delivery, delivery distance, delivery of materials according to the order, and the type and amount of shipping transportation. With the supplier profile factor weighing 49.70% safety record factor 21.90% delivery factor 11.70% quality factor 6.80% cost factor 5.80% service factor 4.10%.

Teks Lengkap:

PDF

Referensi


Adebiyi Ranti Taibat. 2020. Dampak Bahan Terhadap Kesuksesan Proyek Konstruksi Di Lagos Negara, Nigeria. https://www.researchgate.net/publication/341828061

Adianto. 2014. Analisis Pengukuran Kinerja Perusahaan Dengan Metode Performance Prism Dan Scoring Objective Matrix (OMAX) pada PT. BPAS. Jakarta. Jurnal Teknik Industri. Universitas Tarumanagara

Afif, Ahmad. 2015. Hubungan Tingkat Pengetahuan Dengan Ketepatan Penggunaan Obat Analgetik Pada Swamedikasi Nyeri Di Masyarakat Kabupaten Demak. Universitas Muhammadiyah Surakarta

Alumbug Polycarp O., WM Winston, Saidu Shakantu Ibrahim. 2021. Menilai proses gudang produsen bahan konstruksi dari perspektif kepuasan pelanggan. http://www.jtscm.co.za

Anatan, Lina. 2014. Factors Influencing Supply Chain Competitive Advantage and Performance. Vol. 9. No.3. Jurnal Manajement Universitas Maranatha Christian

Badaruddin Mahmud. 2015. Gambaran Pengelolaan Persediaan Obat di Gudang Farmasi Rumah Sakit Umum Daerah Kota Sekayu Kabupaten Musi Banyuasin Palembang. Skripsi. Program sarjana fakultas kesehatan Masyarakat UIN Syarif Hidayatullah. Jakarta.

BPS Sumbar. 2020. “laporan Perekonomian Provinsi Sumatera Barat”. Katalog: 9199007.13

BPS Sumbar. 2021. “Direktori Perusahaan Konstruksi Provinsi Sumatera Barat 2021”. Katalog: 1305055.13

BPS Sumbar. 2022. “Direktori Perusahaan Konstruksi Provinsi Sumatera Barat 2022”. Katalog: 1305055.13

C. Cristea, M. Cristea. 2017. A multi-criteria decision making approach for supplier selection in the flexible packaging industry. EDP Scinces

C. Željko Stevi, Pamuÿcar Dragan, Vasiljevi´C Marko, Stoji'c Gordan. 2017. Model Multi-Kriteria Terintegrasi Baru Untuk Pemasok Seleksi: Studi Kasus Perusahaan Konstruksi. 9, 279; Doi:10.3390/Sym9110279. Www.Mdpi.Com/Journal/Symmetry

Cengiza, A.E., Aytekin, O., ozdemir, I., Kusan, H., & Cabuk, A. 2017. “A multi - Criteria Decision Model for Construction Material Supplier Selection”. Procedia Engineering. Vol. 196. pp. 294 – 301

Dr. Wahidmurni, M.Pd. 2017. Pemaparan Metode Penelitian Kualitatif. Fakultas Ilmu Tarbiyah dan Keguruan UIN Maulana Malik Ibrahim. Malang

Duiyong, C., Shidong, J. & Mingshan, S. 2014. “Engineering construction project site, logistics management”. Journal of Chemical and Pharmaceutical Research. Vol. 6. No. 7. pp. 353–360.

E. Vasina. 2014. Analyzing the process of supplier selection. The application of AHP Method, in Degree Progamme in Industrial Management. Centria. University of Applied Sciences

E. Vasina. 2014. Menganalisis proses pemilihan supplier. Penerapan Metode AHP, pada Program Sarjana Manajemen Industri. Universitas Sains Terapan Centria.

E.A. Frej, L.R.P. Roselli, J. Araújo de Almeida, A. Teixeira de Almeida. 2017. A Multicriteria Decision Model for Supplier Selection in Food Industry Based on FITradeoff Method. Center for Decision Systems and Information Development.

Erdogan Seyit Ali, Šaparauskasb Jonas, Turskisc Zenonas. 2017. Pengambilan Keputusan Dalam Manajemen Konstruksi: AHP Dan Pakar Pendekatan Pilihan. Rekayasa Procedia 172 (2017) 270 – 276. Alamat Email: Jonas.Saparauskas@Vgtu.Lt

F. Tahriri. 2013. Tinjauan Metode Pemilihan Pemasok di Industri Manufaktur. Jurnal Sains dan Teknologi. 15(3). hlm. 201-208

Fitriana Cholidah Nur dan Santosa Budi. 2020. Analisis Faktor-Faktor Pemilihan Suplier Material pada Jasa Usaha Konstruksi dengan Metode Fuzzy AHP. Volume 9. No 1.

Fitriana Cholidah Nur dan Santosa Budi. 2020. Analisis Faktor-Faktor Pemilihan Suplier Material pada Jasa Usaha Konstruksi dengan Metode Fuzzy AHP. Volume 9. No 1.

Jumas, D. 2020. “Model Estimasi Biaya Bangunan pada Gedung”. LPPM Universitas Bung Hatta.

Jumas, D. Rahim, F.A., Zainon, N and Utama W.P. 2018. “Improving accuracy of conceptual cost estimation using MRA and ANFIS in Indonesian building projects”. Built Environment project and Asset Management. Vol. 8 No. 4 (348-357)

Magdalena, H. 2012. “Sistem Pendukung Keputusan untuk Menentukan Mahasiswa Lulusan Terbaik di Perguruan Tinggi (Studi Kasus Stmik Atma Luhur Pangkalpinang)”. Jurnal Informatika, Progam Studi Sistem Informasi STMIK Atma Luhur Pangkalpinang. hal. 49-56. ISSN : 2089-9815

Messah Yunita A.,Utomo Sudiyo,Tefu Santi F., 2016, kajian kriteria dalam sistem pemilihan pemasok material oleh perusahaan kontraktor di kota kupang menggunakan metode analytical hierarchy process (AHP)., Jurnal Teknik Sipil, Vol. V, No. 1.

Mokhlesian Shahin. 2014. Bagaimana Kontraktor Memilih Pemasok Untuk Proyek Konstruksi Yang Lebih Ramah Lingkungan? Kasus Tiga Perusahaan Swedia. ISSN 2071-1050. Www.Mdpi.Com/Journal/Sustainability

O Sobat, AK Gupta, RK Garg. 2013. Kriteria dan Metode Pemilihan Pemasok dalam Rantai Pasokan: Sebuah Tinjauan. Jurnal Ekonomi Internasional dan Rekayasa Manajemen

O.Pal, Gupta, A.K., and Garg, R.K. 2013. “Supplier Selection Criteria and Method in Supply Chains: A Review”. International Journal of Economics and Management Engineering. Vol. 9. pp 2667-2673

Paoki Kristina, dkk. 2016. Analisis Manajemen Rantai Pasokan Pada Ponsel Samsung Di Samsung Center Itc Manado. Jurnal Efisiensi Jurusan Manajemen. vol. 16. no.04. hal. 331-332

Patil, A.R. & Pataskar, S.V. 2013. “Analyzing Material Management Techniques on Construction Project”. International Journal of Engineering and Innovative Technology (IJEIT). Vol. 3. No. 4. pp 96-100

Pujawan, I Nyoman Dan ER, Mahendrawati. 2010. Supply Chain Management. Surabaya. Guna Widya. Riquelme, P. and Serpell, A. 2013. “Adding qualitative context factors to analogy estimating of construction projects”. Social and Behavioral Sciences. Vol. 74. pp. 190-202.

Rozan Aufa, Rita Eva, D. Jumas Y. 2023. Penentuan Skala Prioritas Kegiatan Pemeliharaan Jalan Kabupaten Di Kabupaten Pasaman. Provinsi Sumatera Barat

Siahaya, Willem. 2013. Sukses Supply Chain Management Akses Demand Chain Management. Jakarta. Penerbit In Media.

Solov'ev, V V. & Korchagin, A .P. 2014. “Ways to improve the quality of pre- project documentation in Russian Railways”. Economy of Railways. Vol. 3. pp. 21- 26.

Stevic, Z., Pamucar, D., Vasiljevic, M. & Stojic, G. 2017. “Novel Integrated Multi- Criteria Model for Supplier Selection: Case Study Construction Company”. Symmetry. Vol. 9. pp. 279-313

Sugiyono. 2014. Metode Penelitian Pendidikan Pendekatan Kuantitatif, Kualitatif, dan R&D. Bandung. Alfabeta.

Sugiyono. 2016. Metode Penelitian Kuantitatif, Kualitatif dan R&D. Bandung. PT Alfabet

Taherdoost, H. 2017. Determining Sample Size; How To Calculate Survey 45 Sample Size. International Journal of Economics and Management Systems, 2(2), hal. 237–239. Tersedia pada: http://www.iaras.org/iaras/journals/ijems

Thiruchelvam, S & Tookey, J.E. 2011. “Evolving Trends of Supplier Selection Criteria and Methods”. International Journal of Automotive and Mechanical Engineering (IJAME). Vol 4. pp. 437-454.

Tominanto, T. 2016. Sistem Pendukung Keputusan Dengan Metode Analytical Hierarchy Process (Ahp) Untuk Penentuan Prestasi Kinerja Dokter Pada Rsud. Sukoharjo. Infokes: Jurnal Ilmiah Rekam Medis Dan Informatika Kesehatan. 2(1). https://doi.org/10.47701/infokes.v2i1.128

Weele, A.J & Van, J. 2014. Purchasing and supply chain management: analysis, strategy, planning and practice. Andover. Cengage Learning

Widyarto, A. 2012. Peran Supply Chain Management dalam Sistem Produksi dan Operasi Perusahaan. Benefit Jurnal Manajemen dan Bisnis. Vol. 16. No. 2. hlm. 91-98




DOI: https://doi.org/10.31869/rtj.v7i2.4917

Article Metrics

Sari view : 37 times
PDF - 16 times

Refbacks

  • Saat ini tidak ada refbacks.


##submission.copyrightStatement##

"Web Kunjungan Saat ini

Kunjungan Dari Negara

 Flag Counter

 

 

Creative Commons License
Rang Teknik Journal is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.