ANALISIS FAKTOR PENYEBAB REWORK PADA PEKERJAAN KONTRUKSI JALAN KOTA PADANG

Dewi Puspa, Yossyafra Yossyafra, Yosritzal Yosritzal

Sari


Rework is a repeat job that is caused by an error from a construction project. In a construction activity almost always happens rework only the quantity is different. The purpose of this study is identify the factors that cause rework, identify the conditions of rework, identify the intensity of rework on road construction work item in the city of Padang. This study uses qualitative methods with a descriptive approach. The result of the study are the main factors that led to road construction rework in Padang city were design and documentation, managerial factor and resources. Little rework conditions occur in road construction work in the city of Padang. The intensity of work items the occur on average rework is rare.

Keywords: Rework, Construction project, identification.

Teks Lengkap:

PDF

Referensi


Andi., Winata. S., & Hendarlim. Y, (2005) Faktor-Faktor Penyebab Rework pada Pekerjaan Konstruksi. CED, Vol. 7, No. 1, 22–29.

Arikunto., Suharsimi. (2006) Prosedur Penelitian Suatu Pendekatan Praktik. Rineka Cipta, Jakarta

Bungin, Burhan. (2004) Metodologi Penelitian Kualitatif Komunikasi, Ekonomi, dan Kebijakan Publik Serta Ilmu-Ilmu Sosial Lainnya. Kencana, Surabaya

Burati, J.L., Farrington, J.J., and Ledbetter, W.B. (1992) Causes of Quality Deviations in Design and Construction, Journal of Construction Engineering and Management, 118(1), pp. 34-39.

Counstruction Industry Development Agency (CIDA). (1995) Measuring up or Muddling Tough: Best Practice in the Australian Non-Residentila Counstruction Industry, CIDA and Masters Builders Australia, Sydney Australia

Chundawan, Erick. (2014). Model Sumber dan Penyebab Rework pada Tahapan Proyek Konstruksi. Tesis. Surabaya: Fakultas Teknik Sipil dan Perencanaan. Universitas Kristen Petra

Denzin, NK & Lincoln, YS. (1994) Introduction: Entering The Field Of Qualitative Research. Thousand Oaks: Sage Publications.

Herdianto, A., Tanjungsari, ADR., & Hidayat, A. (2015). Evaluasi Pengerjaan Ulang (rework) Pada Proyek Konstruksi Gedung di Semarang. Jurusan Teknik Sipil, Fakultas Teknik, Universitas Diponegoro.

Irfan, R., Aulia, B., & Mubarak (2012). Faktor-Faktor Penyebab Pekerjaan Ulang (rework) Pada Pembangunan Gedung didinas Bina Marga Dan Cipta Karya Unsyiah. Megister Teknik Sipil Program Pasca sarjana Universitas Syiah Kuala Banda Aceh.

Josephson, PE., Larsson, B. and Li H., (2002), Illustrative Benchmarking Rework and Rework Costs in Swedish Construction Industry, Journal of Management in Engineering, 18.

Love, P.E.D. (2002). Influence of Project Type and Procurement Method on Rework Cost in Building Construction Projects, Journal of Construction Engineering and Management, 2002, pp. 18-29

Milles & Huberman,. (1992). Analisis Data Kualitatif, Jakarta : Universitas Indonesia Press, 1992, hlm.16.

Pemerintah Republik Indonesia Tahun, 2009. Peraturan Menteri Pekerjaan Umum Nomor4/PRT/M/2009 tentang Sistem Manajemen Mutu Departemen Pekerjaan Umum Republik Indonesia.

Prianto, K (2014). Analisa Faktor Penyebab Pekerjaan Ulang Pada Proyek Konstruksi di Kota Malang. Jurnal ilmu-ilmu Teknik - Sistem, Vol. 10 No. 2.

Robinson Fayek, A., Dissanayake, M., Campero, O. 2003. Measuring and classifying construction field rework: a pilot study. Department of Civil and Environmental Engineering, University of Alberta. Presented to the Construction Field Rework Committee, Construction Owners Association of Alberta, May 2003.

Sartika, Y., Hidayat, A., & Syahruddin, A (2014). Faktor – Faktor Penyebab Pekerjaan ulang (rework) Pada Proyek Gedung di Kabupaten Rokan Hulu Berdasarkan Persepsi Kontraktor. Program Studi Teknik Sipil Fakultas Teknik Universitas Pasir Pengaraian.

Sarwono, J. (2006) Metode Penelitian Kualitatif Dan Kualitatif. Graha Ilmu, Bandung

Siddik, J & Kaifan, A. (2009). Studi Faktor-Faktor Penyebab rework (rework) Pada Proyek Konstruksi Gedung di Kabupaten Bireuen. Jurusan Teknik Sipil Politeknik Negeri Lhokseumawe. Buletin Utama 2009. Vol. 13 No. 3 : 192-198.

Soeharto, Iman. (1990) Manajemen Proyek Industri: Persiapan, Pelaksanaan, Pengelolaan. Penerbit Erlangga, Jakarta

Soeharto, Imam., (1997). Manajemen Proyek. Erlangga, Jakarta

Sugiyono. (2014) Metode Penelitian Pendidikan Pendekatan Kualitatif, Kualitatif Dan R&D. Alfabeta, Bandung

Suparno. (2014). Penerapan Manajemen Mutu Dari Sumber Daya Manusia (People) Untuk Mengurangi Risiko pekerjaan ulang (rework). Jurusan Teknik Sipil Politeknik Negeri semarang.

Tabrani., Hidayat, A., & Ariyanto, A, (2014). Faktor-faktor Penyebab Pengerjaan Ulang (rework) Yang Berkaitan Dengan Manajerial Pada Proyek Konstruksi Jalan di Kabupaten Rokan Hulu. Skripsi Program Teknik Sipil Fakultas Teknik Universitas Pasir Pengaraian.

Witjaksana, H., & Wahyu Adi, TJ (2012). Analisa rework Pada Kegiatan Konstruksi Proyek Low Rise Building di Pakuwon City, Surabaya Timur. Program Studi Megister Manajemen Teknologi. Institut Teknologi Sepuluh November Surabaya.

Yin, Robert K. (2003) Studi Kasus Desain dan metode. Raja Grafindo Persada, Jakarta

Yosritzal., Purnawan., & Repadi, E.K, Persepsi Owner Terhadap Kompetensi Manajemen Kontraktor Jalan di Sumatera Barat, Jurnal Rekayasa Sipil (JRS-Unand) Vol.13 No.2




DOI: https://doi.org/10.31869/rtj.v5i2.3125

Article Metrics

Sari view : 344 times
PDF - 169 times

Refbacks

  • Saat ini tidak ada refbacks.


##submission.copyrightStatement##

"Web Kunjungan Saat ini

Kunjungan Dari Negara

 Flag Counter

 

 

Creative Commons License
Rang Teknik Journal is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.